Grading & Site Prep in Raleigh, NC

Once the trees are gone, the ground still has to be made ready: stumps pulled, roots raked out, soft spots dealt with, and the clay shaped so rain flows away from where the house, garage or barn will sit.

Get free estimates
A small dozer shaping red clay into a level house pad with grade stakes
Drawing: A small dozer shaping red clay into a level house pad with grade stakes

Typical site prep tasks

TaskPurpose
Stump grubbingRemoves stumps that would rot and settle under a structure
Root rakingClears roots and debris from the top layer of soil
Topsoil stockpileSaves topsoil to spread back on the yard later
Pad buildingCreates a firm, level area for a foundation or slab
Rough gradingSlopes the ground so water moves away from buildings
Driveway baseGives trucks a stable path during construction

Working from your plans

House plans, a site plan or your builder's instructions usually set elevations and how water should leave the site. The grading crew works to those. If you don't have a plan yet, tell the crew; some will rough grade now and fine tune later. For drainage and erosion questions specific to your lot, check with your builder and your town or county.

Price factors

  • Stump count: lots that were heavily wooded have more stumps to pull and dispose of.
  • Slope: moving clay on a sloped lot takes more machine time.
  • Soil: wet clay may need drying time or extra material.
  • Imports and exports: bringing dirt in or hauling it out adds trucking.

Ask each crew

  • Will you save and stockpile the topsoil?
  • Where will stumps go?
  • How will you compact the pad?
  • How will water leave the finished site?

Red clay considerations

Clay holds water and gets slick after rain, then bakes hard in dry weather. Grading crews in the region plan around both. A few dry days before grading usually makes for a better result, and some owners schedule clearing and grading a little apart for that reason.

Frequently asked

Should clearing and grading be one contract?

It's common and makes scheduling easier. Get the scope for both written out.

Can I keep my topsoil?

Ask for it to be stockpiled on site. It's useful for the yard later.

How soon can the builder start after grading?

It depends on the soil and weather. Ask your builder and the grading crew together.